Trumack Assemble Facility

Hamilton Anderson Associates provided services for a new office/assembly facility located on a thirty-two acre brownfield redevelopment site within a state-designated Renaissance Zone.
Read More.

Architecture / Construction Administration / Programming / Site Design / 2000

Share

The existing site posed considerable challenges; it had been filled with construction debris and broken paving ranging from 6 to 16 feet deep. It was paved over and used as a staging area for automobiles from a nearby factory. The design team assessed environmental conditions and integrated Ford Motor Land Development Corporation’s remediation recommendations into the redevelopment program. This recycled site now boasts a 210,000 SF plant that assembles chassis for motor homes. The Construction Association of Michigan (CAM) Magazine described the effort as a phoenix rising from the rubble to give over 100 employees a chance to restore the economy of Detroit’s urban core.

Disciplines

  • Architecture
  • Construction Administration
  • Programming
  • Site Design

Type(s)

  • Industrial

Services

  • Adaptive Reuse
  • Architecture
  • Brownfield Redevelopment Strategy
  • Construction Administration
  • Programming
  • Site Design

Client

  • Don Russell Ford Motor Land Development Corp. One Parklane Boulevard Suite 1500 East Dearborn, Michigan 48126 p 313 323 3100

LOCATION

  • Trumack Assembly Facility Detroit, MI
Back to Projects