Most importantly, the project moved forward while maintaining the operation of the casino and surrounding venues throughout construction. The gaming floor remodel reorganized the casino floor removing the existing center Cashier’s Cage; then repositioned the High Limit venue and established a new center bar. A new slot layout and pedestrian circulation design was implemented providing a more open experience to guests. New gaming pit feature fixtures constructed of polished aluminum, black stone and colorful LED ribbon lighting provide a totally unique experience for gamers. New carpeting and hard surface flooring, as well as new wayfinding signage were installed throughout, providing an updated image and brand.
Disciplines
- Construction Administration
- Interior Design
- Site Design
Type(s)
- Hospitality / Gaming
Services
- Construction Administration
- Interior Architect of Record
- Interior Design
Client
- Neil Breen Design Project Manager MGM MIRAGE Design Group 3260 South Industrial Road Las Vegas, NV 89109 702-792-4756
LOCATION
- New York New York Hotel and Casino Master Plan and Remodel Las Vegas. Nevada
AWARDS
- List


